Opis
TOTAL: 5 COMPLETE SETS (UN-USED)
SIEMENS SGT-300-1S
8 MW GAS TURBINE GENERATOR PACKAGE
SCOPE OF SUPPLY – EACH UNIT
1. GAS TURBINE SKID Siemens SGT-300, 8 MW
1.1 Base Module
Steel Construction Skid
1.2 SGT-300 Gas Turbine Core Engine
10-Stage Compressor
2-Stage Turbine
6 DLE Burners
Annular Combustion Chamber
Ignition System
Flame Monitoring System
Adjustable Inlet Guide Vanes
Tilting-Pad Thrust Bearing
Fuel Piping
Cooling and Sealing Air System
Gas Turbine Casing
Insulation and Associated Accessories
1.3 Lufkin Gearbox
Main Reduction Gear
Auxiliary Gear
Coupling
Monitoring Instruments
1.4 Lubricating Oil System
Main Lube Oil Pump
Auxiliary Lube Oil Pump
Emergency Lube Oil Pump
Oil Mist Separator
Lube Oil Filters
Heater
Cooler
Oil Tank
Piping
Temperature Monitoring
Level Monitoring
Pressure Monitoring
1.5 Starting System
Starting Motor
Hydraulic Motor
Associated Equipment
1.6 Gas Fuel System
Flow Control Valve
Filter
Quick Shut-Off Valve
Vent Valve
Monitoring Instruments
2. GENERATOR
XEMC TFW8-4 – 8 MW
Generator Body
Air-Water Cooler
Brushless Excitation System
Temperature Monitoring System
Vibration Monitoring System
3. AIR INTAKE SYSTEM
Rain Hood
Water Mist Separator
Two-Stage Static Filters (G4 + F9)
Air Inlet Ducting
Silencer
Expansion Joint
Access Platform / Walkway
Monitoring Instruments
4. ENCLOSURE & VENTILATION SYSTEM
Outdoor Acoustic Enclosure
Lighting System
Ventilation Fans
Maintenance Platform
Baffle Valves
5. EXHAUST SYSTEM
Exhaust Structure / Ducting
Thermal Insulation
Insulated Expansion Joint
Monitoring Instruments
6. FIRE FIGHTING SYSTEM
Temperature Detectors
Flame Detectors
Infrared Combustible Gas Detectors
CO₂ Cylinders
Fire Suppression Nozzles
Local CO₂ Cylinder Room
Connecting Piping
7. GAS TURBINE CONTROL SYSTEM
Siemens PCS7
PCS7 Control System
HMI Operator Station
Emergency Trip Push Button
Distributed I/O Panels
8. SPARE PARTS
Spare Parts for Each Unit
9. DOCUMENTATION
Factory Certificates
Technical Drawings
Operation & Maintenance Manuals
COMMON EQUIPMENT FOR THE COMPLETE 5-UNIT PROJECT
Compressor Washing Units – 2 Sets Total
Water Tank
Diaphragm Pump
Low-Pressure Water Piping / Hose
Pressure Gauge
Special Tools – 1 Set Total
Installation Tools
Commissioning Tools
Maintenance Tools